Boardwalk for University of Brighton

Here is a great example of a large boardwalk for the University of Brighton we have completed in March 2022.

To just touch on the enormity of it - each stringer (timber on top of the legs) weighs 380+ kg and it’s built on a 35 degree slope with only access from each end.